AT&T DEFINITY 7200 series Guia do Utilizador Página 231

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
  • Página
    / 348
  • Índice
  • MARCADORES
  • Avaliado. / 5. Com base em avaliações de clientes
Vista de página 230
SYNCHRONIZATION OF DIGITAL FACILITIES B-23
_ ______________________________________________________________________________________
_ ______________________________________________________________________________________
_ ______________________________________________________________________________________
Facility rank ordering is generally based on limited technical and operational information. It is
recommended that facility selections be based on local field experience where available.
RULE 4:
Where possible, the routes for all primary and secondary synchronization facilities should be diverse.
EXAMPLE FOR RULE 4
Figure B-15, Optimal Diverse Routing, explains the optimal configuration when rule 4 is used. Figure B-
16, Less Than Optimal Diverse Routing, shows a less than optimal application of rule 4.
SECONDARY (BACKUP) FREQUENCY REFERENCE
. . . . . . . . . . . . . . . . .
A
PRIMARY FREQUENCY REFERENCE
DIGITAL TRANSMISSION FACILITY
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
D
B
C
Figure B-15. Optimal Diverse Routing
Figure B-16, Less Than Optimal Diverse Routing, shows node C deriving both primary and secondary
timing from node D, via the two separate T1 facilities. If node D should fail, node C would no longer
receive timing that is traceable to node A. Here, node C would lose synchronization and begin to introduce
slips into the network.
Vista de página 230
1 2 ... 226 227 228 229 230 231 232 233 234 235 236 ... 347 348

Comentários a estes Manuais

Sem comentários