AT&T CentreVu Release 3 Version 8 High Availability Connectivity, Upgrade and Administration Guia do Utilizador Página 64

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
  • Página
    / 70
  • Índice
  • MARCADORES
  • Avaliado. / 5. Com base em avaliações de clientes
Vista de página 63
CMS Base Load Upgrade Procedure for High Availability Systems
CentreVu
CMS R3V8 High Availability User Guide
G-2
IConceptual depiction of the base load upgrade process for a CMS HA system.
Primary CMS server Secondary CMS server
Interval A begins (5:00)
(5:29)
Interval B begins (5:30)
(5:59)
Interval C begins
Interval D begins
Synchronize
using 5:00 - 5:29
Synchronize
using 5:30 - 5:59
Note from the graphic
at what point in time
events occur.
Base Load Upgrades
= Link up
= Link down
Link down (perform upgrade)
Link up
Link down (perform
upgrade)
Link up
(5:13)
(5:19)
Link back up
Link back up
(
5:
35)
(
5:
42)
Vista de página 63
1 2 ... 59 60 61 62 63 64 65 66 67 68 69 70

Comentários a estes Manuais

Sem comentários