AT&T DEFINITY 7300 series Manual de Instruções Página 83

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
  • Página
    / 438
  • Índice
  • MARCADORES
  • Avaliado. / 5. Com base em avaliações de clientes
Vista de página 82
INSTALLATION
Consideration should be given to installing secondary protection on each
out-of-building facility connected to the TAE if any of the following conditions
exist:
The service entrance (protector block) ground is not properly
installed (bonded to building ground, for example).
The local telephone company does not permit access to the
protector block.
High-voltage surge protection is not provided.
Install the CBC as follows:
1.
Connect one end of the CBC to the ground point at the network
interface.
2. Wrap the CBC loosely around the cable from the network interface
to the TAE and then around a splitter cable to the cabinet. If
possible, tie wrap the CBC to the cables.
3. Connect the end of the CBC to the ground block on Cabinet 1. See
Figure 2-13.
2-59
Vista de página 82
1 2 ... 78 79 80 81 82 83 84 85 86 87 88 ... 437 438

Comentários a estes Manuais

Sem comentários